Royal Anne Apartments Seattle full interior renovation by Construction Expeditors in Puyallup, WA

Apartment Building Full Interior Remodel, Seattle, WA

BUILDING TYPE:
Apartments
BUILDING SIZE:
3 Stories, 22 Units

STATUS:
Completed 2026

PROJECT:
Full Interior Renovation

YEAR BUILT:
1956

LOCATION:
1101 Queen Anne Ave N
Seattle, WA 98109

Full Interior Remodel including Power, Plumbing, Electrical, HVAC, Kitchens, Flooring - Everything

The three-story Royal Anne Apartments, built in 1956, are located halfway up Queen Anne Hill with easy access to shopping, restaurants, and activities. This brick building features 22 spacious apartments with large windows for lots of natural lighting and some beautiful views. After 70 years of daily use, its major systems, including electrical, plumbing, and HVAC systems had surpassed their expected life spans. This renovation was a transformation that updated a structurally sound building with modern, high-quality systems, materials, workmanship, and popular modern amenities.

Demolition to The Studs

We removed everything down to the studs and then supplied and installed everything from new power to the building, framing, electrical, plumbing, and HVAC.

Royal Anne Apartments Seattle full interior renovation by Construction Expeditors in Puyallup, WA
Royal Anne Apartments
Royal Anne Apartments
Royal Anne Apartments
Royal Anne Apartments Seattle full interior renovation by Construction Expeditors in Puyallup, WA
Royal Anne Apartments
Royal Anne Apartments
Royal Anne Apartments

Expert Teams and Processes

Our teams are committed to timely completion on budget with excellent craftsmanship. We start with careful planning and coordination, have skilled and team members, and keep a tidy and well-organized job site.

Royal Anne Apartments
Royal Anne Apartments
Royal Anne Apartments
Royal Anne Apartments
Royal Anne Apartments
Royal Anne Apartments
Royal Anne Apartments
Royal Anne Apartments

Scope of Work

  • General demolition and cleanup
  • New power to the building
  • Excavation
  • Electrical
  • HVAC
  • Plumbing
  • Fire alarm
  • Windows
  • Framing
  • Insulation
  • Roofing
  • Intercom
  • Fire caulking
  • Flooring
  • Drywall
  • Doors
  • Trim work
  • Painting
  • Appliances
  • Cabinetry and countertops
  • Interior wrought iron rails
  • New hardware
  • Store front
  • Exterior repairs
  • General demolition and cleanup
  • New power to the building
  • Excavation
  • Electrical
  • HVAC
  • Plumbing
  • Fire alarm
  • Windows
  • Framing
  • Insulation
  • Roofing
  • Intercom
  • Fire caulking
  • Flooring
  • Drywall
  • Doors
  • Trim work
  • Painting
  • Appliances
  • Cabinetry and countertops
  • Interior wrought iron rails
  • New hardware
  • Store front
  • Exterior repairs

Classic Architecture, Fully Modernized Interiors

We rebuilt this apartment building to meet the expectations of today’s tenants. We installed all-new kitchens, bathrooms, flooring, lighting, and windows—delivering clean, modern finishes designed to attract and retain high-quality, long-term residents. Every detail was selected for durability, low maintenance, and long-term value, helping the property owner maximize ROI while elevating the overall living experience. The result is a complete transformation from an outdated structure into a refreshed, competitive multifamily property built to perform for years to come.

Upgraded kitchen, Royal Anne Apartments, Seattle, WA.
Modern kitchen with all new appliances.
Living room with new flooring, paint, and lighting.
Upgraded bathroom with all new fixtures and shelfing, flooring, and lighting.
Updated bedroom with new flooring, paint, lighting, and window coverings.
Upgraded kitchen, Royal Anne Apartments, Seattle, WA.
Modern kitchen with all new appliances.
Living room with new flooring, paint, and lighting.
Upgraded bathroom with all new fixtures and shelfing, flooring, and lighting.
Updated bedroom with new flooring, paint, lighting, and window coverings.

Common Area Upgrades That Enhance Safety and Asset Value

Common areas were strategically upgraded to improve safety, durability, and overall property performance. The main entry—both exterior and interior—was modernized with updated finishes and lighting to strengthen curb appeal and first impressions. These improvements not only elevate the resident experience but also contribute to lower operating costs and a more competitive, income-producing asset. Stairwells were enhanced with long-lasting rubber treads, custom wrought iron railings, and energy-efficient LED lighting to increase visibility and reduce ongoing maintenance. Hallways were refreshed with new carpet, paint, and lighting, creating a clean, consistent appearance that supports tenant satisfaction and retention.

Updated main entry, Royal Anne Apartments, Seattle, WA.
Main entry interior with new flooring, lighting, and paint.
Upgraded stairway with custom iron railings, new stair treads, lighting, and paint.
Upgraded stairway.
Royal Anne Apartments, Seattle, WA.
Upgraded hallway.
Updated main entry, Royal Anne Apartments, Seattle, WA.
Main entry interior with new flooring, lighting, and paint.
Upgraded stairway with custom iron railings, new stair treads, lighting, and paint.
Upgraded stairway.
Upgraded hallway.
Royal Anne Apartments, Seattle, WA.

Older Apartment Building Renovations

The Royal Anne Apartments has a long, useful life ahead. With our extensive planning and proven-successful processes, we can complete a renovation of this type in 100 days on budget.  Royal Anne’s new systems and modern interior with quality materials and workmanship will look attractive and perform well for many, many years.

Contact us today to discuss your residential property renovation, remodel, or new construction.